Timber wall claddings installed.
Metal wall claddings installed.
PVC flooring of the kitchen completed.
First & second fix plumbing works of the kitchen & bar completed
New bar built up (Designed) (Steel box framed and cladded with timber)
Commercial appliances were installed
Minor electrical works completed.
CCTV cameras, DVR and monitor installed.
Shop front signage (Illuminated) installed.
Shop front painted.
All painting & decorating works
All the loose furniture supplied and installed.
Concrete and timber floors protected against dust.
Timber wall and bar claddings were protected against fire.