Site Management

Supply and do the backfilling & PIR Insulation works at ground floor

Supply and cast polished concrete floor at ground & basement floors

Supply and install vinyl floor at basement floor

First & second fix plumbing works

Supply and install new partition walls

Supply and install new suspended ceiling

Supply and plaster the walls & ceilings

Supply and paint the walls & ceiling

Supply and install new steel stairs

Supply and install new steel entrance door (H=3.5m)

Supply and install kitchen cupboards

Supply and install worktop for kitchen

Supply and install kitchen appliances

Supply & Manufacture & install Library (stainless steel covered)

Supply & Manufacture & Install Corian Reception Desk

Supply and install interior sliding timber doors

Supply & Manufacture & Install Bookshelf at Basement floor

Supply & Install Entrance Mat

Cleaning & Waste disposal during the construction

Final cleaning and handover (Material + Labour)

Installation of Zumtobel Linear lighting

Installation of ERCO Track lighting

All electrical works (First & second fix)

First fix works of x16 CCTV Cameras

Supply and install fire alarm system and fire escape lights

Supply and install new electrical distribution board

Supply and install scaffolding inside the lightwell for piping & cabling works

Supply and install MVHR (outdoor units) ducting system (Including WC extraction) to the roof

Supply and install diffusers, plenum boxes, attenuators, volume control dampers

Supply and install slot line recessed diffusers to the walls & ceilings

Supply and install ventilation grills (including ceiling type for pantry & toilet) to the face of the walls

Prepare and submit shop drawings (Riba Stage 5 drawings)

Supply and backfill the basement floor before concrete.

Supply and relocate the rainwater pipe at ground floor

Supply and relocate the boosted cold water supply pipe in the basement - Calculations and reporting pressure loss on the new routed pipe

Supply and install evolve Roller (curtains) system (motorised)(Remote control)

Supply and apply the intumescent paint to timber joists and plywood on the basement ceiling

Structural works of pantry opening (including temporary works design and execution)

Supply and install new floor hatches (Howegreen - Visedge Series)

Supply and install heat Pump VRF System (air conditioners)

Supply and install dehumidifier with drainage in the storage

Modifications on sound barriers to pass through ducts

Stage-4 mechanical design review and verification services

Supply and install new signage (Flag & Letters) (Non-illuminated)

Structural works of over lightwell door for core drills (including temporary works design and works)

Supply and install low voltage points (Sensors, detectors, sounders, expanders and alarm points)

Supply and install IT Data Cabling Points

Supply and install Lutron Processor + Dali Module + Keypad with face plate + Power supply

Supply & install steel framed bottom steel box around the circular steel column

Supply & repair the stones on the sides of main entrance

Supply & install the main electrical power temporarily to the distribution board

Supply and install fire resistant door for BOH

Supply & install the interface to connect the fire alarm panel of the gallery & main building entrance

Supply & install metal framed plasterboard boxes to cover the pipes & cables at basement ceiling

Supply & Repair - INTERNAL (plasterboards, plastering, painting) the entrance door area after the replacement of temporary door with the new entrance door

Supply & Install - EXTERNAL - the similar side stones to both side of the entrance door

Supply and install door sequence selector to the new entrance door

Supply and install a sandstone threshold