Site Management
Supply & replace the damaged rainwater pipe between basement & ground floor level
Supply & install mobile scaffolding platform
Repair & paint the entrance (Outdoor) canopy of the building
Repair & paint the facade walls of the basement floor up the first-floor balcony
Repair & paint the entrance hall / stairway / elevator halls (Indoor) the building
Fix the loose carpets on the stairs (Labour Only)
Final Cleaning and disposal of materials